CPC40110 Certificate IV in Building and Construction Skills Assessment 

This Assessment will allow our trainer to look at gap training too fast track your certification.
To achieve this qualification you must complete
16 units of competency
13 core units
3 elective units

Some units in this qualification may have prerequisite requirements, which must be met when packaging the qualification.

Use this assessment to determine where gaps in the unit may occur.
The student is to acknowledge how often they do a task by ticking either FREQUENTLY, NOT OFTEN OR NOT AT ALL. If the answer is NOT OFTEN. The trainer will ask competency questions around the unit to establish competency. If NOT AT ALL, this will indicate that gap training in the unit may occur. If the response is FREQUENTLY then this will indicate the unit CAN BE nominated for RPL.

Have you maintained on a day by day basis financial management of the business?
Please provide referees, certificates or anything applicable.
How often do you apply assessment methods available to determine compliance with the BCA?
Please provide referees, certificates or anything applicable.
How often have you completed an inspection report to align with best practices and statutory obligations such as: Hazard sheets, Checklists Company safety procedure forms Prescribed self-assessment tools identified by the WHS Act 2011
Please provide referees, certificates or anything applicable.
Do you select contracts for a particular project such as: Australian Standard Contracts including the AS2124 and AS4000 Construction Industry contract (CIC) suite Contracts required or supplied by regulatory authorities Joint contract committee (JCC) Master builders association Housing industry association Simple building works, including series 1 and series 2 (SBW2 Lump Sum)
Please provide referees, certificates or anything applicable.
Have you prepared project costs for construction per square metre?
Please provide referees, certificates or anything applicable.
Have you planned and allocated human and physical resources to a project?
Please provide referees, certificates or anything applicable.
CPCCBC4006B Select, procure and store construction materials for low rise projects
Please provide referees, certificates or anything applicable.
Have you viewed 2-D CAD drawings, run costing programs and printed copies from these programs?
Please provide referees, certificates or anything applicable.
Have you implemented a site safety policy?
Please provide referees, certificates or anything applicable.
Have you sighted insurance documentation, citing protection that meets industry requirements?
Please provide referees, certificates or anything applicable.
Have you applied structural principles behind the safe erection and demolition of a low rise structure? Structural principles includes: Behaviour of structural materials Loads and loading Performance of beams Performance of columns Performance of trusses Section properties Solution of force systems Wind bracing
Please provide referees, certificates or anything applicable.
Have you applied structural principles behind the safe erection and demolition of low rise structures classified within the BCA as Classes 2 to 9 with a gross floor area not exceeding 2000 square metres, not including Type A or Type B construction?
Please provide referees, certificates or anything applicable.
"Have you used communication techniques to deal with team conflict and resolving issues, such as: Face to face Formal/informal interaction Verbal, written or electronic communication "
Please provide referees, certificates or anything applicable.
Have you applied survey and levelling principles relating to performance of site set-out, including contouring, volume and grade calculations?
Please provide referees, certificates or anything applicable.
"Have you checked tender documentation and calculations in short timeframes, suck as: Cost schedules Details of specialist resources Details of specific terms and conditions to be included and excluded in relation to contracts Estimated timeframes Site layout information "