Stand Alone Power Systems (SAPS) Pathway to Accreditation
Solar Australian Accreditation (SAA) have developed a clear path of units for achieving accreditation, this table details the prerequisite units and their connections to SAPS.
| Unit Code | Unit Name | Prerequisite Units |
|---|---|---|
| UEERE0055 | Conduct site survey for off-grid photovoltaic/generating set systems | N/A |
| UEERE0063 | Design off-grid photovoltaic/generating set systems | UEERE0055 |
| UEERE0079 | Install off-grid power conversion equipment to electrical installation |
UEERE0078 – Install photovoltaic systems to power conversion equipment UEERE0081 – Install photovoltaic systems to power conversion equipment |
*Additional units are required if you don't hold your Unrestricted Electrical Licence.